Three Lake George environmental conservation groups have released a final design for the West Brook Gaslight Village Project, a stormwater treatment system that will be located on the parcel on the south side of West Brook. Dubbed the “West Brook Conservation Initiative,” the Lake George Association, the FUND for Lake George and the Lake George Land Conservancy, have been working together to develop the project under the terms of a conservation easement they jointly hold with three municipal partners: the town and the village of Lake George, and Warren County.
The final plan includes restored wetlands and an environmental park that will be built on 4.9 acres south of West Brook Road where the Charley’s Saloon building stands south of the former Gaslight Village. The entire 12-acre project represents one of the most important conservation efforts in Lake George’s history, according to advocates. Designed by the Chazen Companies, the plan for the south parcel of the property will restore wetlands to naturally slow stormwater generated from the Route 9 corridor and adjoining properties, capture sediment and filter pollutants which currently make there way to a growing delta at the mouth of West Brook.Due to the filling of historic wetlands, channeling of the stream, and development in the stream’s watershed, West Brook today is the single largest source of contaminant — pollution, nutrients and sediment — entering the south basin of Lake George. The delta at the mouth of the brook has grown to over 7,000 square meters. The land was once part of the Delaware & Hudson Railroad Yards, and later a string of attractions related to the property next door which housed Gaslight Village from 1959 to 1989.
The project will feature a settling pond to trap and retain sediment, a shallow marsh where wetland plantings will store and treat run-off, and a gravel wetland where dense root mats, crushed stone and a microbe rich environment will improve the water quality before it is conveyed to West Brook. Environmental engineers believe that the best way to treat stormwater is through natural processes of wetlands, where water is captured and retained for a period of time and allowing sediment and nutrients to be dropped out as the water is cleansed.
Project engineers estimate that 90% of the sediment will be successfully treated by this system and over one-half of the nutrients will be removed. The wetland systems are designed to also provide an open environmental park, with interpretative signage, nature trails, elevated walkways, a pavilion, an outdoor classroom, gazebo, overlooks and picnic areas for the general public.
”This project will capture and treat millions of gallons of stormwater that annually flow into the lake untreated,” Peter Bauer, executive director of the FUND for Lake George, said. The project has been carefully designed to require minimal or no maintenance according to Bauer including the use of drought resistant meadow-like grasses will require no mowing, watering or fertilizing. Minimal mowing is expected to be necessary in selected areas close to West Brook Road for aesthetic purposes, although the grass seed to be used there is a mix of fescues that will produce a low-growing and drought tolerant grass. New native plants, shrubs and trees will require little or no weeding, pruning or fertilizing. Periodically – after a few years of maturity – the wetland plantings will need to be thinned and excess plant materials removed.
Some $200,000 in state and federal funding will be used to complete the construction of the project, but money is still needed to repay for the land. In addition to the $2.1 million loan on the Gaslight Village purchase by the LGA and the FUND, the Lake George Land Conservancy is carrying a $2.7 million loan on the 1,400-acre Berry Pond tract, which protects the upland watershed for West Brook.
Demolition of Charley’s Saloon is expected to begin in mid-June, following the conclusion of Americade; construction of the storm water management complex will begin after the Adirondack Nationals Car Show in early September.
Recent Almanack Comments